• Home
  • Well Control
  • Value Cases
    • Blowout Risk Reduction
    • Extreme Sour Gas Applications
    • 9-Second EDS (Dynamic Positioning Operability)
    • Emergency Response
    • Well Design Optimization
    • High Pressure Riser
  • Technology
    • K-BOS – CT, HWO, WL/SL
    • K-BOS – Subsea
    • K-BOS – Surface Drilling
    • StackLite SGV
    • StackLite RVM – Surface
    • StackLite RVM – Subsea
    • StackLite Systems
  • About Us
    • Our Team
    • Our Company
    • Our Story
  • Kinetic News Room
  • Contact Us

Other

Kinetic Pressure Control and NASA Johnson Space Center complete Probabilistic Risk Assessment showing 3 orders of magnitude increase in reliability for BOP Equipment

1 August 2018
HOUSTON TX, August 2018–Kinetic Pressure Control and NASA are pleased to announce a Probabilistic Risk Assessment (PRA) which compares the reliability of existi...
Read More

SCF Ventures Announces Partnership with Kinetic Pressure Control

17 July 2018
SCF Ventures leads the Series A investment round of growth equity into Kinetic Pressure Control, a leading designer, and manufacturer of innovative wellhead and...
Read More

Kinetic Pressure Control Ltd. completes a closed capital funding round for product development and technology validation.

8 January 2018
HOUSTON TX, January 2018 – Kinetic Pressure Control has completed a closed capital funding round. The funds have been raised from existing angel and seed invest...
Read More

Kinetic Pressure Control Ltd. opens a new test pad, manufacturing and assembly operations, and offices at Thrustmaster of Texas Inc. facility in Houston TX

18 November 2017
HOUSTON TX, November 2017 – Following several successful rounds of “shear anything” testing of the Kinetic Blowout Stopper (K-BOS) at a specialized test range i...
Read More

Kinetic Pressure Control Ltd. Completes Successful Shear Test of a 3 ½” OD 1” WT Drill Collar using a 4 1/16” bore K-BOS

1 July 2017
HOUSTON TX, July 2017 – In a matter of milliseconds what had been one piece of steel drill collar pipe with a 3 ½” outer diameter and 1” thick walls, became two...
Read More
  • Recent Posts
    • 18-15M K-BOS – Shear and Seal on 9.5″ DC – PASS
    • Delivery of 13-5/8″ 10,000psi K-BOS Rental Package
    • Kinetic to Present at 2022 IADC Well Control Conference: “Reducing Blowout Probability w/ K-BOS”
    • NESR and Kinetic Pressure Control Present “K-BOS DB” at the Aramco Drilling Innovation Technical Symposium & Exhibition
    • Shell, Kongsberg, and Kinetic to Present at the MTS DP 2022 Conference: “K-BOS Achieving 9-Second Emergency Disconnect”
  • Archives
    • January 2023
    • October 2022
    • September 2022
    • June 2022
    • April 2022
    • March 2022
    • December 2021
    • November 2021
    • August 2021
    • May 2021
    • March 2021
    • January 2021
    • December 2020
    • July 2020
    • May 2020
    • February 2020
    • January 2020
    • December 2019
    • November 2019
    • October 2019
    • August 2019
    • June 2019
    • May 2019
    • August 2018
    • July 2018
    • January 2018
    • November 2017
    • July 2017
    • October 2016
  • Home
  • Well Control
  • Value Cases
  • K-BOS – Completion, Intervention & Workover
  • K-BOS – Subsea Drilling
  • K-BOS – Surface Drilling
  • Control System
  • Our Team
  • Our Company
  • Our Story
  • Kinetic News Room
  • Contact Us
Copyright © 2023. Kinetic Pressure Control. All Rights Reserved.
Kinetic Pressure Control
  • Home
  • Well Control
  • Value Cases
    ▼
    • Blowout Risk Reduction
    • Extreme Sour Gas Applications
    • 9-Second EDS (Dynamic Positioning Operability)
    • Emergency Response
    • Well Design Optimization
    • High Pressure Riser
  • Technology
    ▼
    • K-BOS – CT, HWO, WL/SL
    • K-BOS – Subsea
    • K-BOS – Surface Drilling
    • StackLite SGV
    • StackLite RVM – Surface
    • StackLite RVM – Subsea
    • StackLite Systems
  • About Us
    ▼
    • Our Team
    • Our Company
    • Our Story
  • Kinetic News Room
  • Contact Us