Kinetic to present at DrillWell / Drill Safe in Perth on June 7th and 8th in Perth
25 May 2023
Perth WA: Kinetic Pressure Control is honored to sponsor the Drill Well / Drill Safe event on June 7 and 8 in Perth....
Piston Well Services hosts Kinetic at SPE D&C Canada Workshop
23 May 2023
Banff AB, Kinetic was honored to be hosted by our sales channel partner Piston Well Services at the inaugural SPE D&C Workshop this week in Banff AB. The K-...
18-15M K-BOS – Shear and Seal on 9.5″ DC – PASS
19 January 2023
Houston TX: Kinetic Pressure Control is pleased to announce the following successful test of the 18-15M K-BOS: Device: 18-15M K-BOS (KB18C501) API 16A Size: 18-...
Delivery of 13-5/8″ 10,000psi K-BOS Rental Package
12 January 2023
Houston TX: Kinetic Pressure Control is pleased to announce the delivery of another 13-10M K-BOS unit for rental service into surface drilling applications. Thi...
Kinetic to Present at 2022 IADC Well Control Conference: “Reducing Blowout Probability w/ K-BOS”
5 October 2022
Oslo, Norway: Eni, Kwantis, and Kinetic Pressure Control are pleased to announce that they will present a paper at this year’s IADC Well Control Conferenc...
NESR and Kinetic Pressure Control Present “K-BOS DB” at the Aramco Drilling Innovation Technical Symposium & Exhibition
4 October 2022
Grand Hyatt Hotel, Al Khobar, Saudi Arabia: Together with our partner NESR, Kinetic Pressure Control is pleased to participate in Saudi Aramco Drilling & Wo...
Shell, Kongsberg, and Kinetic to Present at the MTS DP 2022 Conference: “K-BOS Achieving 9-Second Emergency Disconnect”
4 October 2022
Houston Texas: Together with co-authors Shell and Kongsberg, Kinetic Pressure Control will be presenting a paper titled “K-BOS Achieving 9-Second Emergenc...
Kinetic Pressure Control Attends IBP Rio Oil & Gas 2022
25 September 2022
Rio de Janeiro: Kinetic Pressure Control was pleased to attend IBP Rio Oil & Gas 2022. This year’s event was a welcome return to face to face networki...
Update! Accelerated EDS Results in Improved Drilling Rig DP Operability, 9-Second EDS Enables Shallow Water Drilling DP Ops
2 June 2022
Houston TX: A detailed analysis together with Kongsberg has shown that a 9-second EDS results in dramatically improved DP operability and can enable Shallow Wat...
IADC Chairman Thigpen Highlights New Technologies – K-BOS Success
29 April 2022
Jeremy Thigpen, 2022 IADC Chairman “Technological advances are often designed to further safeguard our employees or to deliver heightened equipment and sy...