• Home
  • Well Control
  • Value Cases
    • Blowout Risk Reduction
    • Extreme Sour Gas Applications
    • 9-Second EDS (Dynamic Positioning Operability)
    • Emergency Response
    • Well Design Optimization
    • High Pressure Riser
  • Technology
    • K-BOS – CT, HWO, WL/SL
    • K-BOS – Subsea
    • K-BOS – Surface Drilling
    • StackLite SGV
    • StackLite RVM – Surface
    • StackLite RVM – Subsea
    • StackLite Systems
  • About Us
    • Our Team
    • Our Company
    • Our Story
  • Kinetic News Room
  • Contact Us

April 2022

IADC Chairman Thigpen Highlights New Technologies – K-BOS Success

29 April 2022
Jeremy Thigpen, 2022 IADC Chairman “Technological advances are often designed to further safeguard our employees or to deliver heightened equipment and sy...
Read More

The Ultimate in Safety Tech: The K-BOS Provides Well Control Certainty at up to 50% H2S

20 April 2022
   Unmatched Shearing and Sealing + Unmatched Component Integrity = the Ultimate in Safety With significant operational experience in the Middle East, the field...
Read More

Innovative Seabed Isolation Device for High-Pressure Riser Applications

20 April 2022
Aberdeen, UK: The use of high-pressure subsea riser systems enables some subsea wells to be drilled efficiently using a jack-up rig, therefore allowing operator...
Read More

Successful Activation of the K-BOS on the Deepwater Invictus in the US GOM

8 April 2022
Transocean’s Deepwater Invictus has successfully tested K-BOS (Kinetic Blowout Stopper), shearing a 6-5/8” V-150 50 lbs/ft drill pipe at a depth of 2,400 feet. ...
Read More
  • Recent Posts
    • 18-15M K-BOS – Shear and Seal on 9.5″ DC – PASS
    • Delivery of 13-5/8″ 10,000psi K-BOS Rental Package
    • Kinetic to Present at 2022 IADC Well Control Conference: “Reducing Blowout Probability w/ K-BOS”
    • NESR and Kinetic Pressure Control Present “K-BOS DB” at the Aramco Drilling Innovation Technical Symposium & Exhibition
    • Shell, Kongsberg, and Kinetic to Present at the MTS DP 2022 Conference: “K-BOS Achieving 9-Second Emergency Disconnect”
  • Archives
    • January 2023
    • October 2022
    • September 2022
    • June 2022
    • April 2022
    • March 2022
    • December 2021
    • November 2021
    • August 2021
    • May 2021
    • March 2021
    • January 2021
    • December 2020
    • July 2020
    • May 2020
    • February 2020
    • January 2020
    • December 2019
    • November 2019
    • October 2019
    • August 2019
    • June 2019
    • May 2019
    • August 2018
    • July 2018
    • January 2018
    • November 2017
    • July 2017
    • October 2016
  • Home
  • Well Control
  • Value Cases
  • K-BOS – Completion, Intervention & Workover
  • K-BOS – Subsea Drilling
  • K-BOS – Surface Drilling
  • Control System
  • Our Team
  • Our Company
  • Our Story
  • Kinetic News Room
  • Contact Us
Copyright © 2023. Kinetic Pressure Control. All Rights Reserved.
Kinetic Pressure Control
  • Home
  • Well Control
  • Value Cases
    ▼
    • Blowout Risk Reduction
    • Extreme Sour Gas Applications
    • 9-Second EDS (Dynamic Positioning Operability)
    • Emergency Response
    • Well Design Optimization
    • High Pressure Riser
  • Technology
    ▼
    • K-BOS – CT, HWO, WL/SL
    • K-BOS – Subsea
    • K-BOS – Surface Drilling
    • StackLite SGV
    • StackLite RVM – Surface
    • StackLite RVM – Subsea
    • StackLite Systems
  • About Us
    ▼
    • Our Team
    • Our Company
    • Our Story
  • Kinetic News Room
  • Contact Us