• Home
  • Well Control
  • Value Cases
    • Blowout Risk Reduction
    • Extreme Sour Gas Applications
    • 9-Second EDS (Dynamic Positioning Operability)
    • Emergency Response
    • Well Design Optimization
    • High Pressure Riser
  • Technology
    • K-BOS – CT, HWO, WL/SL
    • K-BOS – Subsea
    • K-BOS – Surface Drilling
    • StackLite SGV
    • StackLite RVM – Surface
    • StackLite RVM – Subsea
    • StackLite Systems
    • SGV for MPD
    • Vanguard SGV for Well Frac
  • About Us
    • Our Team
    • Our Company
    • Our Story
  • Kinetic News Room
  • Contact Us
  • Careers

December 2019

18-15M K-BOS Shears Wireline in Slack Condition following 750 pressure test cycles to 15ksi

30 December 2019
Houston TX, Dec 30, 2019:  Following accelerated life cycle testing including more than 750 cycles to 15,000 psi, the 18-15M K-BOS successfully completed a shea...
Read More

K-BOS Shears an 18″ heavy duty casing with 6-5/8″ inner drillstring w/ combined 167ppf

17 December 2019
December 2019, Houston TX: Kinetic’s 18-15M K-BOS successfully completed a shear test of an 18” 117ppf, P110 heavy casing with 6-5/8” 50ppf, V150 inner st...
Read More
  • Recent Posts
    • 5-15M K-BOS rental systems for Wireline and Coil Tubing Applications
    • IPTC 2024 – Dhahran Expo
    • Another 18-3/4″ 15M K-BOS Delivery
    • Another 13-5/8″ 10M K-BOS Delivery
    • Kinetic to present at DrillWell / Drill Safe in Perth on June 7th and 8th in Perth
  • Archives
    • March 2024
    • February 2024
    • January 2024
    • November 2023
    • May 2023
    • January 2023
    • October 2022
    • September 2022
    • June 2022
    • April 2022
    • March 2022
    • December 2021
    • November 2021
    • August 2021
    • May 2021
    • March 2021
    • January 2021
    • December 2020
    • July 2020
    • May 2020
    • February 2020
    • January 2020
    • December 2019
    • November 2019
    • October 2019
    • August 2019
    • June 2019
    • May 2019
    • August 2018
    • July 2018
    • January 2018
    • November 2017
    • July 2017
    • October 2016
  • Home
  • Well Control
  • Value Cases
  • Our Team
  • Kinetic News Room
  • Contact Us
  • Careers
Copyright © 2025. Kinetic Pressure Control. All Rights Reserved.
Kinetic Pressure Control
  • Home
  • Well Control
  • Value Cases
    ▼
    • Blowout Risk Reduction
    • Extreme Sour Gas Applications
    • 9-Second EDS (Dynamic Positioning Operability)
    • Emergency Response
    • Well Design Optimization
    • High Pressure Riser
  • Technology
    ▼
    • K-BOS – CT, HWO, WL/SL
    • K-BOS – Subsea
    • K-BOS – Surface Drilling
    • StackLite SGV
    • StackLite RVM – Surface
    • StackLite RVM – Subsea
    • StackLite Systems
    • SGV for MPD
    • Vanguard SGV for Well Frac
  • About Us
    ▼
    • Our Team
    • Our Company
    • Our Story
  • Kinetic News Room
  • Contact Us
  • Careers