• Home
  • Well Control
  • Value Cases
    • Blowout Risk Reduction
    • Extreme Sour Gas Applications
    • 9-Second EDS (Dynamic Positioning Operability)
    • Emergency Response
    • Well Design Optimization
    • High Pressure Riser
  • Technology
    • K-BOS – CT, HWO, WL/SL
    • K-BOS – Subsea
    • K-BOS – Surface Drilling
    • StackLite SGV
    • StackLite RVM – Surface
    • StackLite RVM – Subsea
    • StackLite Systems
  • About Us
    • Our Team
    • Our Company
    • Our Story
  • Kinetic News Room
  • Contact Us

October 2022

Kinetic to Present at 2022 IADC Well Control Conference: “Reducing Blowout Probability w/ K-BOS”

5 October 2022
Oslo, Norway: Eni, Kwantis, and Kinetic Pressure Control are pleased to announce that they will present a paper at this year’s IADC Well Control Conferenc...
Read More

NESR and Kinetic Pressure Control Present “K-BOS DB” at the Aramco Drilling Innovation Technical Symposium & Exhibition

4 October 2022
Grand Hyatt Hotel, Al Khobar, Saudi Arabia: Together with our partner NESR, Kinetic Pressure Control is pleased to participate in Saudi Aramco Drilling & Wo...
Read More

Shell, Kongsberg, and Kinetic to Present at the MTS DP 2022 Conference: “K-BOS Achieving 9-Second Emergency Disconnect”

4 October 2022
Houston Texas: Together with co-authors Shell and Kongsberg, Kinetic Pressure Control will be presenting a paper titled “K-BOS Achieving 9-Second Emergenc...
Read More
  • Recent Posts
    • 18-15M K-BOS – Shear and Seal on 9.5″ DC – PASS
    • Delivery of 13-5/8″ 10,000psi K-BOS Rental Package
    • Kinetic to Present at 2022 IADC Well Control Conference: “Reducing Blowout Probability w/ K-BOS”
    • NESR and Kinetic Pressure Control Present “K-BOS DB” at the Aramco Drilling Innovation Technical Symposium & Exhibition
    • Shell, Kongsberg, and Kinetic to Present at the MTS DP 2022 Conference: “K-BOS Achieving 9-Second Emergency Disconnect”
  • Archives
    • January 2023
    • October 2022
    • September 2022
    • June 2022
    • April 2022
    • March 2022
    • December 2021
    • November 2021
    • August 2021
    • May 2021
    • March 2021
    • January 2021
    • December 2020
    • July 2020
    • May 2020
    • February 2020
    • January 2020
    • December 2019
    • November 2019
    • October 2019
    • August 2019
    • June 2019
    • May 2019
    • August 2018
    • July 2018
    • January 2018
    • November 2017
    • July 2017
    • October 2016
  • Home
  • Well Control
  • Value Cases
  • K-BOS – Completion, Intervention & Workover
  • K-BOS – Subsea Drilling
  • K-BOS – Surface Drilling
  • Control System
  • Our Team
  • Our Company
  • Our Story
  • Kinetic News Room
  • Contact Us
Copyright © 2023. Kinetic Pressure Control. All Rights Reserved.
Kinetic Pressure Control
  • Home
  • Well Control
  • Value Cases
    ▼
    • Blowout Risk Reduction
    • Extreme Sour Gas Applications
    • 9-Second EDS (Dynamic Positioning Operability)
    • Emergency Response
    • Well Design Optimization
    • High Pressure Riser
  • Technology
    ▼
    • K-BOS – CT, HWO, WL/SL
    • K-BOS – Subsea
    • K-BOS – Surface Drilling
    • StackLite SGV
    • StackLite RVM – Surface
    • StackLite RVM – Subsea
    • StackLite Systems
  • About Us
    ▼
    • Our Team
    • Our Company
    • Our Story
  • Kinetic News Room
  • Contact Us