• Home
  • Well Control
  • Value Cases
    • Blowout Risk Reduction
    • Extreme Sour Gas Applications
    • 9-Second EDS (Dynamic Positioning Operability)
    • Emergency Response
    • Well Design Optimization
    • High Pressure Riser
  • Technology
    • K-BOS – CT, HWO, WL/SL
    • K-BOS – Subsea
    • K-BOS – Surface Drilling
    • StackLite SGV
    • StackLite RVM – Surface
    • StackLite RVM – Subsea
    • StackLite Systems
  • About Us
    • Our Team
    • Our Company
    • Our Story
  • Kinetic News Room
  • Contact Us

Archives

Steve Angstmann

18 October 2018
Before co-founding Kinetic Pressure Control, Mr. Angstmann spent the beginning of his career working in various roles for one of the leading offshore drilling e...
Read More

Billy Gallagher

18 October 2018
Before being promoted to COO, Billy served as VP of Product Development and co-founder of Kinetic Pressure Control. He has lead the successful engineering effor...
Read More

Kevin Schmidt

18 October 2018
Before joining Kinetic Pressure Control, Mr. Schmidt spent 13 years working in major capital projects for ExxonMobil Development Company. He was responsible for...
Read More

Reese Jones

18 October 2018
Mr. Jones has been a member of Kinetic Pressure Control’s executive leadership team since August 2018. Before joining the Kinetic Pressure Control team, M...
Read More

Colin Moir

16 July 2021
Throughout his career, Colin has been involved in a number of industry-first technology development and deployment initiatives, PM on numerous multi-million dol...
Read More

Ken Dupal

9 November 2020
Throughout his career, Ken has been involved in a number of industry-first technology development and deployment initiatives, including pre-installed mooring sy...
Read More

Melvyn F. (Mel) Whitby

4 November 2020
Mel Whitby has over 52 years of engineering experience, including 40 years of experience in the oilfield industry, with extensive knowledge in research and deve...
Read More
  • Recent Posts
    • 18-15M K-BOS – Shear and Seal on 9.5″ DC – PASS
    • Delivery of 13-5/8″ 10,000psi K-BOS Rental Package
    • Kinetic to Present at 2022 IADC Well Control Conference: “Reducing Blowout Probability w/ K-BOS”
    • NESR and Kinetic Pressure Control Present “K-BOS DB” at the Aramco Drilling Innovation Technical Symposium & Exhibition
    • Shell, Kongsberg, and Kinetic to Present at the MTS DP 2022 Conference: “K-BOS Achieving 9-Second Emergency Disconnect”
  • Archives
    • January 2023
    • October 2022
    • September 2022
    • June 2022
    • April 2022
    • March 2022
    • December 2021
    • November 2021
    • August 2021
    • May 2021
    • March 2021
    • January 2021
    • December 2020
    • July 2020
    • May 2020
    • February 2020
    • January 2020
    • December 2019
    • November 2019
    • October 2019
    • August 2019
    • June 2019
    • May 2019
    • August 2018
    • July 2018
    • January 2018
    • November 2017
    • July 2017
    • October 2016
  • Home
  • Well Control
  • Value Cases
  • K-BOS – Completion, Intervention & Workover
  • K-BOS – Subsea Drilling
  • K-BOS – Surface Drilling
  • Control System
  • Our Team
  • Our Company
  • Our Story
  • Kinetic News Room
  • Contact Us
Copyright © 2023. Kinetic Pressure Control. All Rights Reserved.
Kinetic Pressure Control
  • Home
  • Well Control
  • Value Cases
    ▼
    • Blowout Risk Reduction
    • Extreme Sour Gas Applications
    • 9-Second EDS (Dynamic Positioning Operability)
    • Emergency Response
    • Well Design Optimization
    • High Pressure Riser
  • Technology
    ▼
    • K-BOS – CT, HWO, WL/SL
    • K-BOS – Subsea
    • K-BOS – Surface Drilling
    • StackLite SGV
    • StackLite RVM – Surface
    • StackLite RVM – Subsea
    • StackLite Systems
  • About Us
    ▼
    • Our Team
    • Our Company
    • Our Story
  • Kinetic News Room
  • Contact Us