5-15M K-BOS rental systems for Wireline and Coil T...
March 28th, 2024 | Board | No Comment
Houston TX: The 5-15M K-BOS configuration (KB05A502) for very-high sour and ultra sour intervention service has the specification in the following table and is certified ...
IPTC 2024 – Dhahran Expo
February 6th, 2024 | Board | No Comment
Dhahran KSA, Kinetic Pressure Control is honored to be hosted by NESR at this year's IPTC in Dhahran KSA at booth 4230.
Another 18-3/4″ 15M K-BOS Delivery
January 3rd, 2024 | Board | No Comment
Houston TX: The team at Kinetic Pressure Control is very pleased to announce the delivery of yet another K-BOS system to our growing rental fleet. ...
Another 13-5/8″ 10M K-BOS Delivery
November 3rd, 2023 | Board | No Comment
Houston TX: The team at Kinetic Pressure Control is very pleased to announce the delivery of yet another K-BOS system to our growing rental fleet. This ...
Kinetic to present at DrillWell / Drill Safe in Pe...
Perth WA: Kinetic Pressure Control is honored to sponsor the Drill Well / Drill Safe event on June 7 and 8 in Perth.
Piston Well Services hosts Kinetic at SPE D&C...
May 23rd, 2023 | Board | No Comment
Banff AB, Kinetic was honored to be hosted by our sales channel partner Piston Well Services at the inaugural SPE D&C Workshop this week in ...
18-15M K-BOS – Shear and Seal on 9.5″ ...
January 19th, 2023 | Board | No Comment
Houston TX: Kinetic Pressure Control is pleased to announce the following successful test of the 18-15M K-BOS:
Device: 18-15M K-BOS (KB18C501)
API 16A Size: 18-3/4” ...
Delivery of 13-5/8″ 10,000psi K-BOS Rental P...
January 12th, 2023 | Value Cases | No Comment
Houston TX: Kinetic Pressure Control is pleased to announce the delivery of another 13-10M K-BOS unit for rental service into surface drilling applications. This unit, ...
Kinetic to Present at 2022 IADC Well Control Confe...
October 5th, 2022 | Board | No Comment
Oslo, Norway: Eni, Kwantis, and Kinetic Pressure Control are pleased to announce that they will present a paper at this year's IADC Well Control Conference: ...
NESR and Kinetic Pressure Control Present “K...
October 4th, 2022 | Board | No Comment
Grand Hyatt Hotel, Al Khobar, Saudi Arabia: Together with our partner NESR, Kinetic Pressure Control is pleased to participate in Saudi Aramco Drilling & Workover ...